top of page
![](https://static.wixstatic.com/media/11062b_3ed986e7d4664b70aa563423352c130ff000.jpg/v1/fill/w_288,h_162,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/11062b_3ed986e7d4664b70aa563423352c130ff000.jpg)
WORKSHOP FAN REFURBISHMENT
CASE STUDY 7
SCOPE:
Extractor Fan Refurbishments, Test and Inspection
CHALLENGES:
Working to tight deadlines and ensuring all moving parts are checked in accordance with manufacturers guide-lines.
SOLUTIONS/AIMS: Carry out detailed service inspection and report to ensure the motor, bearings, and frame is thoroughly checked balanced and commissioned in the workshop prior to being sent on to site.
![Picture18.jpg](https://static.wixstatic.com/media/8994f4_e7dc3cb7880a4edc91866a749a315c5c~mv2.jpg/v1/fill/w_438,h_364,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/Picture18.jpg)
![Picture17.jpg](https://static.wixstatic.com/media/8994f4_59eee87247964dc680512c4a4e6286a5~mv2.jpg/v1/fill/w_439,h_370,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/Picture17.jpg)
bottom of page